Media report on testing of new bridge at Advanced Structures and Composites Center
WABI (Channel 5), News Center Maine, WVII (Channel 7) and Engineering.com reported on the July 12 reveal and testing of a composite bridge project at the University of Maine Advanced Structures and Composites Center. The event was a test of the bridge’s capacities, with a goal to load the bridge with up to 120,000 pounds without […]
Read more