WVII reports on installation of composite bridge girders developed at UMaine
WVII (Channel 7) reported that the Maine Department of Transportation (MDOT) will use composite tub girders, a technology developed at the University of Maine Advanced Structures and Composites Center, to repair the Grist Mill Bridge in Hampden. UMaine licensed the technology to Advanced Infrastructure Technologies (AIT) of Brewer, who produced the girders for MDOT.