Team Update

The team verified the chord length we had for the main foil (4 in.) was appropriate because we will be cutting the foam cores with a hot wire cutter. We had to figure out how to change the scale of the profile on Solidworks as the profile that was downloaded from Grabcad was much too large […]

Team Update

The team received the ordered aluminum from Bangor Steel. After seeing the aluminum in person we realized the size piping we ordered was much too large. The team went back and redid the design stress calculations to see what sizing we needed and then another order was placed as well as the old aluminum was […]

Team Update

The team has finished clearing out the spot we will use for infusions in the AMC. The aluminum piping has been ordered from Bangor Steel and should be received by next week. The team began practicing the infusion process and the parts did not come out as expected. The resin did not cover the entire […]

Top