The team did analysis on potential design concepts and decided on a new design to move forward with. The team assigned each of the parts for the design to create in Solidworks. The assembly was created and finished by Andrew. The team also did analysis for the load that will be applied to each of the parts. In the coming week, the team will be working to complete the second interim report.