WABI (Channel 5), News Center Maine, WVII (Channel 7) and Engineering.com reported on the July 12 reveal and testing of a composite bridge project at the University of Maine Advanced Structures and Composites Center. The event was a test of the bridge’s capacities, with a goal to load the bridge with up to 120,000 pounds without read more Media report on testing of new bridge at Advanced Structures and Composites Center