{"id":4140,"date":"2019-06-28T18:41:23","date_gmt":"2019-06-28T22:41:23","guid":{"rendered":"https:\/\/umaine.edu\/ofm\/?p=4140"},"modified":"2019-06-29T08:51:25","modified_gmt":"2019-06-29T12:51:25","slug":"hilltop-commons-roof-replacement","status":"publish","type":"post","link":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/","title":{"rendered":"Hilltop Commons Roof Replacement"},"content":{"rendered":"<p style=\"text-align: center\">SECTION 00 11 13<br \/>\nADVERTISEMENT FOR BIDS<\/p>\n<p>Sealed Bids in envelopes plainly marked:\u00a0 <strong>HILLTOP COMMONS ROOF REPLACEMENT<\/strong><\/p>\n<p>addressed to:<\/p>\n<p style=\"padding-left: 30px\">University of Maine<br \/>\nOffice of Facilities Management<br \/>\nc\/o Carolyn McDonough, Director of Capital Planning &amp; Project Management<br \/>\n5765 Service Building, Room 111<br \/>\nOrono ME 04469<\/p>\n<p>will be received until <strong><u>3:00pm<\/u><\/strong> on <strong><u>Tuesday, July 16, 2019<\/u><\/strong>, at which time the Bids will be opened and read aloud in Room 109 Service Building.\u00a0 Bids received after the stated time will not be considered and will be returned unopened.<\/p>\n<p>Bids must be accompanied by a satisfactory Bid Bond for 5% of the Bid (checks will not be accepted) which shall be in conformity with the form of Bond contained in Section 00 43 13 of the Specifications.\u00a0 The University reserves the right to waive all formalities and reject any or all bids or to accept any bids.\u00a0 Scholarships, donations or gifts to the University will not be considered in the evaluation of responses.<\/p>\n<p>The successful Bidder will be required to furnish a 100% Performance Bond and a 100% Payment Bond to cover the execution of the Contract which shall be in conformity with the form of Bonds contained in Sections 00 61 13.13 and 00 61 13.16, respectively, of the Specifications and shall be for the Contract amount.<\/p>\n<p>Bidders may attend a <u>non-mandatory<\/u> pre-bid meeting at Hilltop Commons, University of Maine, on <u>Tuesday, July 2, 2019<\/u>, at <u>9:00am<\/u>.\u00a0 This will be the only time the building will be available for inspection.\u00a0 Copies of plans and specifications will not be available at the pre-bid meeting.\u00a0 Acquiring or reviewing plans and specifications prior to the meeting is advised.<\/p>\n<p>Project Summary:\u00a0 The Project consists of removal of the existing EPDM membrane and insulation system to roof deck and replacement with a new PVC membrane and insulation system.\u00a0 The project is expected to be awarded by the end of July 2019 with a substantial completion date for the curb below the refrigeration compressor of August 16, 2019 and a total project Substantial Completion date of October 8, 2019.<\/p>\n<p>The electronic documents (.pdf) may be examined and downloaded at the following site:<\/p>\n<p>Specifications: \u00a0<a href=\"https:\/\/umaine.edu\/ofm\/resource\/specifications-hilltop-commons-roof-replacement\/\">Hilltop Commons Roof Replacement<\/a><br \/>\nDrawings: \u00a0<a href=\"https:\/\/umaine.edu\/ofm\/resource\/drawings-hilltop-commons-roof-replacement-temp\/\">Hilltop Commons Roof Replacement<\/a><\/p>\n<p>In complying with the letter and spirit of applicable laws and pursuing its own goal of diversity, the University of Maine System shall not discriminate on the grounds of race, color, religion, sex, sexual orientation, including transgender status or gender expression, national origin, citizenship status, age, disability, genetic information, or veterans status in employment, education, and all other areas of the University System.\u00a0 The University provides reasonable accommodations to qualified individuals with disabilities upon request.\u00a0 General contractors, subcontractors, and product suppliers bidding on this project must subscribe and adhere to same.<\/p>\n<p>UNIVERSITY OF MAINE<br \/>\nClaire I. Strickland, Chief Business Officer, for<br \/>\nUniversity of Maine System Board of Trustees<\/p>\n<p style=\"text-align: center\">END OF SECTION 00 11 13<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SECTION 00 11 13 ADVERTISEMENT FOR BIDS Sealed Bids in envelopes plainly marked:\u00a0 HILLTOP COMMONS ROOF REPLACEMENT addressed to: University of Maine Office of Facilities Management c\/o Carolyn McDonough, Director of Capital Planning &amp; Project Management 5765 Service Building, Room 111 Orono ME 04469 will be received until 3:00pm on Tuesday, July 16, 2019, at [&hellip;]<\/p>\n","protected":false},"author":617,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[2,3],"tags":[],"class_list":["post-4140","post","type-post","status-publish","format-standard","hentry","category-advertisements-for-bids","category-capital-construction"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hilltop Commons Roof Replacement - Office of Facilities Management - University of Maine<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hilltop Commons Roof Replacement - Office of Facilities Management - University of Maine\" \/>\n<meta property=\"og:description\" content=\"SECTION 00 11 13 ADVERTISEMENT FOR BIDS Sealed Bids in envelopes plainly marked:\u00a0 HILLTOP COMMONS ROOF REPLACEMENT addressed to: University of Maine Office of Facilities Management c\/o Carolyn McDonough, Director of Capital Planning &amp; Project Management 5765 Service Building, Room 111 Orono ME 04469 will be received until 3:00pm on Tuesday, July 16, 2019, at [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\" \/>\n<meta property=\"og:site_name\" content=\"Office of Facilities Management\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-28T22:41:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-06-29T12:51:25+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Hilltop Commons Roof Replacement\",\"datePublished\":\"2019-06-28T22:41:23+00:00\",\"dateModified\":\"2019-06-29T12:51:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\"},\"wordCount\":451,\"commentCount\":0,\"articleSection\":[\"Advertisements for Bids\",\"Capital Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\",\"url\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\",\"name\":\"Hilltop Commons Roof Replacement - Office of Facilities Management - University of Maine\",\"isPartOf\":{\"@id\":\"https:\/\/umaine.edu\/ofm\/#website\"},\"datePublished\":\"2019-06-28T22:41:23+00:00\",\"dateModified\":\"2019-06-29T12:51:25+00:00\",\"author\":{\"@id\":\"\"},\"breadcrumb\":{\"@id\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/umaine.edu\/ofm\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hilltop Commons Roof Replacement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/umaine.edu\/ofm\/#website\",\"url\":\"https:\/\/umaine.edu\/ofm\/\",\"name\":\"Office of Facilities Management\",\"description\":\"University of Maine\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/umaine.edu\/ofm\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\/\/umaine.edu\/ofm\/author\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hilltop Commons Roof Replacement - Office of Facilities Management - University of Maine","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/","og_locale":"en_US","og_type":"article","og_title":"Hilltop Commons Roof Replacement - Office of Facilities Management - University of Maine","og_description":"SECTION 00 11 13 ADVERTISEMENT FOR BIDS Sealed Bids in envelopes plainly marked:\u00a0 HILLTOP COMMONS ROOF REPLACEMENT addressed to: University of Maine Office of Facilities Management c\/o Carolyn McDonough, Director of Capital Planning &amp; Project Management 5765 Service Building, Room 111 Orono ME 04469 will be received until 3:00pm on Tuesday, July 16, 2019, at [&hellip;]","og_url":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/","og_site_name":"Office of Facilities Management","article_published_time":"2019-06-28T22:41:23+00:00","article_modified_time":"2019-06-29T12:51:25+00:00","twitter_card":"summary_large_image","twitter_misc":{"Written by":"","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#article","isPartOf":{"@id":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/"},"author":{"name":"","@id":""},"headline":"Hilltop Commons Roof Replacement","datePublished":"2019-06-28T22:41:23+00:00","dateModified":"2019-06-29T12:51:25+00:00","mainEntityOfPage":{"@id":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/"},"wordCount":451,"commentCount":0,"articleSection":["Advertisements for Bids","Capital Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/","url":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/","name":"Hilltop Commons Roof Replacement - Office of Facilities Management - University of Maine","isPartOf":{"@id":"https:\/\/umaine.edu\/ofm\/#website"},"datePublished":"2019-06-28T22:41:23+00:00","dateModified":"2019-06-29T12:51:25+00:00","author":{"@id":""},"breadcrumb":{"@id":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/umaine.edu\/ofm\/2019\/06\/28\/hilltop-commons-roof-replacement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/umaine.edu\/ofm\/"},{"@type":"ListItem","position":2,"name":"Hilltop Commons Roof Replacement"}]},{"@type":"WebSite","@id":"https:\/\/umaine.edu\/ofm\/#website","url":"https:\/\/umaine.edu\/ofm\/","name":"Office of Facilities Management","description":"University of Maine","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/umaine.edu\/ofm\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"","url":"https:\/\/umaine.edu\/ofm\/author\/"}]}},"taxonomy_info":{"category":[{"value":2,"label":"Advertisements for Bids"},{"value":3,"label":"Capital Construction"}]},"featured_image_src_large":false,"author_info":{"display_name":"","author_link":"https:\/\/umaine.edu\/ofm\/author\/"},"comment_info":0,"category_info":[{"term_id":2,"name":"Advertisements for Bids","slug":"advertisements-for-bids","term_group":0,"term_taxonomy_id":2,"taxonomy":"category","description":"","parent":0,"count":6,"filter":"raw","cat_ID":2,"category_count":6,"category_description":"","cat_name":"Advertisements for Bids","category_nicename":"advertisements-for-bids","category_parent":0},{"term_id":3,"name":"Capital Construction","slug":"capital-construction","term_group":0,"term_taxonomy_id":3,"taxonomy":"category","description":"","parent":0,"count":6,"filter":"raw","cat_ID":3,"category_count":6,"category_description":"","cat_name":"Capital Construction","category_nicename":"capital-construction","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/posts\/4140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/users\/617"}],"replies":[{"embeddable":true,"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/comments?post=4140"}],"version-history":[{"count":4,"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/posts\/4140\/revisions"}],"predecessor-version":[{"id":4158,"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/posts\/4140\/revisions\/4158"}],"wp:attachment":[{"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/media?parent=4140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/categories?post=4140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/umaine.edu\/ofm\/wp-json\/wp\/v2\/tags?post=4140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}