UMaine’s BMPs are broken down into the six categories of minimum control measures (MCM) required by the MS4 General Permit. MS4 Minimum Control Measure MCM#1: Public Education and Outreach Best Management Practice Goal Educational Displays, Pamphlets, Booklets and Utility Stuffers Increase employee and resident students awareness of stormwater management plan Promotional Give-aways Use promotional materials to reinforce