Skip Navigation

UMaine News

Follow us on Twitter Join us on Facebook Watch us on YouTube Contribute to our Flickr Group

Newspaper Reports on Planned Castine Wind Turbine Test

The Bangor Daily News interviewed Habib Dagher, director of the University of Maine Advanced Structures and Composites Center, about plans to move a 57-foot-tall, scale-model wind turbine being built at UMaine to Castine harbor in April for testing. The project is part of a wind-energy demonstration project expected to lead to a much larger offshore wind turbine network planned off Monhegan Island in the Gulf of Maine.

Comments are closed.

More in Engineering, UMaine in the News (1556 of 4596 articles)