September 9: Capacity limit increase = reservations no longer needed

GREAT NEWS! The Rec Center has been approved for Phase 2 of our reopening. Effective immediately, our building capacity has increased to the point where the reservation system will not be needed. Capacity limits in individual areas of the facility are still in place, and although most of them have increased slightly, you may still need to (for example) visit cardio before you are able to get into the weight room.

Because we will not be doing reservations, time blocks are no longer needed either, and we will no longer need to close the building in between time blocks.
The reservation system for the Rec Center will be taken down from WebTrac by the end of the day. **Maine Bound reservations will still be required so that system will stay in place on WebTrac.**

In the next few weeks, watch for Phase 2(B) of our reopening, when the pool will reopen and fitness programming will start back up. (Dates are still TBA on that though!)
If you have any questions please comment here.