|
Advertisements
Current Projects (updated 05/20/13)
Request for Designer:
None
at this time.
Request for
Construction Contractor:
ALUMNI
HALL EXTERIOR RESTORATION
The Project consists of replacing the
south side fascia, soffit and trim detail as shown on plans, and the
painting of all exterior windows, doors, frames and screens of Alumni
Hall. There is a bid alternate for
this Project.
There will be no pre-bid meeting.
Bids must be received in Facilities
Management prior to 2:00pm
on Tuesday,
June
4, 2013.
Click here for more information.
___________________________________________________________________
FOGLER
LIBRARY COLLABORATIVE LEARNING SPACE
The Project consists of the
construction of one classroom, two group study rooms and one IDF space on
the first floor within the existing library.
A mandatory
pre-bid meeting will be held in Room 120A of the Fogler Library on Thursday,
May 9, 2013 at 1:00pm.
Bids must be received in Facilities
Management prior to 1:00pm
on Thursday,
May
23, 2013.
Click
here for more information.
ADDENDUM 1, dated May 14, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
1
ADDENDUM 2, dated May 20, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
2
Other Requests:
PAVING
MAINTENANCE FY14
The
Project consists of placing overlay pavement on existing paved campus
roads, parking lots and sidewalks. Locations
will be selected based on total tonnage to be placed, which quantity may
vary based on the unit prices received.
Associated miscellaneous items including shim pavement, bituminous
curb and adjusting structures to grade will be done as necessary.
There
will be no pre-bid meeting.
Bids
must be received in Facilities Management prior to 2:00pm on Tuesday,
June 11, 2013.
Click here for more information.
___________________________________________________________________
ORONO
BOG WALK
The Project, located in the City of
Bangor, consists of the replacement of approximately 880 linear feet of the
existing dock type floating sections of marsh boardwalk constructed
primarily of rough sawn hemlock. This
is the first phase of a larger project to replace the entire 4,971 linear
foot boardwalk. The new walkway
structure will meet all code compliance and ADA requirements of the Federal
and State governments.
A non-mandatory pre-bid meeting will
be held at the site located within the Bangor City Forest on Tripp Drive
off Stillwater Avenue in Bangor, Maine, on Thursday, April 25, 2013
at 10:00am.
Bids must be received in Facilities
Management prior to 2:00pm
on Thursday,
May
9, 2013.
UPDATE: THE SPECIFICATIONS AND DRAWINGS FOR THIS PROJECT HAVE
BEEN POSTED.
Click here
for more information.
ADDENDUM 1, dated April 26, 2013, has been added to the
Proposal Documents. This Addendum revises the:
1. Non-mandatory
pre-bid meeting date to Thursday, May 9, 2013 at 10:00am
2. BID OPENING
date to 2:00pm on Thursday, May 30, 2013.
Please refer to the following link to
access the Addendum: Addendum
1
ADDENDUM 2, dated April 29, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
2
ADDENDUM 3, dated May 17, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
3
|