The University of Maine, Office of Facilities Management



 

 

Designers & Contractors

Advertisements

Current Projects (updated 05/20/13)

 

Request for Designer:

 

None at this time.

 

 

Request for Construction Contractor:

 

ALUMNI HALL EXTERIOR RESTORATION

 

The Project consists of replacing the south side fascia, soffit and trim detail as shown on plans, and the painting of all exterior windows, doors, frames and screens of Alumni Hall.  There is a bid alternate for this Project.

 

There will be no pre-bid meeting.

 

Bids must be received in Facilities Management prior to 2:00pm on Tuesday,

June 4, 2013.

 

Click here for more information.

 

___________________________________________________________________

FOGLER LIBRARY COLLABORATIVE LEARNING SPACE

 

The Project consists of the construction of one classroom, two group study rooms and one IDF space on the first floor within the existing library.

 

A mandatory pre-bid meeting will be held in Room 120A of the Fogler Library on Thursday, May 9, 2013 at 1:00pm.

 

Bids must be received in Facilities Management prior to 1:00pm on Thursday,

May 23, 2013.

 

Click here for more information.

 

ADDENDUM 1, dated May 14, 2013, has been added to the Proposal Documents.  Please refer to the following link to access the Addendum:  Addendum 1

 

ADDENDUM 2, dated May 20, 2013, has been added to the Proposal Documents.  Please refer to the following link to access the Addendum:  Addendum 2

 

Other Requests:

 

PAVING MAINTENANCE FY14

 

The Project consists of placing overlay pavement on existing paved campus roads, parking lots and sidewalks.  Locations will be selected based on total tonnage to be placed, which quantity may vary based on the unit prices received.  Associated miscellaneous items including shim pavement, bituminous curb and adjusting structures to grade will be done as necessary.

 

There will be no pre-bid meeting.

 

Bids must be received in Facilities Management prior to 2:00pm on Tuesday,

June 11, 2013.

 

Click here for more information.

 

___________________________________________________________________

ORONO BOG WALK

 

The Project, located in the City of Bangor, consists of the replacement of approximately 880 linear feet of the existing dock type floating sections of marsh boardwalk constructed primarily of rough sawn hemlock.  This is the first phase of a larger project to replace the entire 4,971 linear foot boardwalk.  The new walkway structure will meet all code compliance and ADA requirements of the Federal and State governments.

 

A non-mandatory pre-bid meeting will be held at the site located within the Bangor City Forest on Tripp Drive off Stillwater Avenue in Bangor, Maine, on Thursday, April 25, 2013 at 10:00am.

 

Bids must be received in Facilities Management prior to 2:00pm on Thursday,

May 9, 2013.

 

UPDATE:  THE SPECIFICATIONS AND DRAWINGS FOR THIS PROJECT HAVE BEEN POSTED.

 

Click here for more information.

 

ADDENDUM 1, dated April 26, 2013, has been added to the Proposal Documents.  This Addendum revises the:

 

1.  Non-mandatory pre-bid meeting date to Thursday, May 9, 2013 at 10:00am

2.  BID OPENING date to 2:00pm on Thursday, May 30, 2013.

 

Please refer to the following link to access the Addendum:  Addendum 1

 

ADDENDUM 2, dated April 29, 2013, has been added to the Proposal Documents.  Please refer to the following link to access the Addendum:  Addendum 2

 

ADDENDUM 3, dated May 17, 2013, has been added to the Proposal Documents.  Please refer to the following link to access the Addendum:  Addendum 3

 

 

Office of Facilities Management

The University of Maine, Orono, ME 04469